Project Location:Thailand
Product: Finned Tube
Standard and material: Base Pipe: GB/T 5310 20G / Fin Material: 08AL
Specifications:PIPE: OD 38MM WT 3.5MM LENGTH 10.68-11.66M
Application:Boiler Parts
Xinyue has maintained a long-term cooperative relationship with this Thai client, who has consistently procured our seamless boiler tubes over the years, thereby establishing a solid foundation for our collaboration. In April of this year, recognizing Xinyue’s consistent product quality and professional service, the client placed its first order for a new product—finned tubes. This trust is the result of sustained mutual efforts and long-term cooperation.
In the early stages of the project, Xinyue conducted multiple pre-production meetings, during which the quality assurance team proactively identified potential risks and developed strategies to ensure quality control from the outset. This rigorous and systematic approach has reinforced the client’s confidence in Xinyue when selecting partners for new product development.
To ensure product quality, the client has arranged for a third-party supervisor to oversee the entire manufacturing process, closely monitoring every stage from raw material entry, processing and production, to inspection and delivery. Xinyue actively supports and cooperates with all on-site inspection activities. Whenever detailed issues arise, the company promptly organizes its quality control and technical teams to address and resolve them, demonstrating a strong commitment to quality assurance.
Currently, this batch of finned tubes has been successfully delivered, ensuring the timely progress of the client’s project. Going forward, Xinyue will continue to uphold its professional expertise and sense of responsibility, striving to become a reliable and trusted partner for its clients.